Things are not going well. I had to retro fit the slushie machine in the galley area due to a low hanging cupboard. I hate drywall. I tried to avoid the sheetrock at all costs. It's such an annoying aspect of construction. The dust got everywhere even though I had things covered. It made the filtration system go haywire and nearly caused an emergency engage, almost locking down level three.
Simultaneously this caused for a surge in the electric system to the lab which fried the new brain probes that were plugged in and getting a firmware update. This meant that I had to go to the main level electrical conduit and reset the breaker. I can't wait to get the elevator going. Two of the brain probes are fried beyond repair and I've got to replace the chip sets in several more.
I've got my work cut out for me.